Opening Soon
Construction is wrapping up on the Lynda and Stewart Resnick Student Union — set to open in September. The new $65 million, 84,000-square-foot building was made possible by students in a 2017 fee referendum as well as a generous gift from the Resnicks and other private donors. Students will be able to access meeting spaces, lounge areas, retail dining options, a large-scale conference room and much more.